Construction and operation of long span structures
Venue:
Hall №3.7
Date:
October 31 2019
Time:
14:30 - 16:00
Moderator:
Deputy Head of Bridge Settlement, Institute Giprostroymost - Saint-Petersburg
Темы выступлений:
1.Relationship between Russia's regulatory and testing base with design, construction and operation of bridges
Alexey A. Sergeev, C.Sc.Eng., General Director, Regulatory and Testing Center “Mosty”
2.Features of structural analysis the span structure of the bridge across the Moscow Canal as part of the Central Ring Road
Deputy Head of Bridge Settlement, Institute Giprostroymost - Saint-Petersburg
3.Determining the critical speed of long span bridges flutter
Head of Specification Development Department, Institute Giprostroymost - Saint-Petersburg
4.Bridge Architecture and BIM Technology
Architect, Institute Giprostroymost - St. Petersburg
Head of Visualization Group, Institute Giprostroymost - St. Petersburg
5.Scientific and technical support for the reconstruction of the Luzhniki Grand Sports Arena in Moscow for the 2018 FIFA World Cup in Russia
Head of the laboratory of rationing, reconstruction and monitoring of unique buildings and structures, TSNIISK n. a. V. A. Kucherenko, AO NIC Stroitelstvo
6.Application of Large-span glued wooden structures in the construction of special facilities
Dmitry D. Mayorov, General Director of Rus: New Territories (Development), member of the Board of Directors of the Corporation "Rus" (production of glued wooden construction, building), RUS Corporation