He started his career in 2002 at JSC Uralgipromez, and since 2009 he has worked at CJSC Institute Projectstalkonstruktsia. He worked his way up from technician to chief project engineer.
I design and survey buildings and structures for civil and industrial purposes. Among them are the facilities of Yekaterinburg EXPO, MEGA Yekaterinburg and MEGA Adygea shopping centers, the Cadet School in Kyzyl, JSC PNTZ, JSC Uralmashzavod, JSC Chelyabinsk Zinc Plant, JSC Electrozink, JSC Uralkali, JSC SUMZ, JSC Uraltrubprom, JSCSeverstal, Novo-Sverdlovskaya TPP, Reftinskaya GRES, Verkhnetagilskaya GRES, Voronezh TPP-1, Akademicheskaya TPP, residential buildings, office buildings, sports palaces, cultural palaces, churches and temples.
- In 2011, he defended his PhD thesis in the specialty "Building structures, buildings and structures" at the N.P. Melnikov Central Research Institute.
- In 2014, he carried out work on the survey of the "White Tower".
- Currently, he is an associate professor at the UrFU Department of Building Structures. I combine teaching with scientific research and practical work.