
Valery Hajdukov
Background
In 1996, he was Deputy Director of the Southern Regional Cadastral Center. Since 2003, he has been the Head of the Department of the Federal Cadastral Center.
In 2007, he became Director of the Russian Railways Land and Property Complex Design Center at Roszheldorproekt, and in 2012, he served as Director of the Railway Engineering Survey Center.
In 2013, he joined the Transputstroy company, where he became Deputy General Director for Production.
Currently, he holds the position of Project Management Director of the Project Engineering and Pre-Design Department at Giprogor Project.