Alexander Belyaev

Position:Deputy Head of the Design Department
Employer:Stroyproekt Institute
Country:Russia

Background

Head of the Design team

  • Reconstruction of the Alexander Nevsky Bridge across the Neva River in St. Petersburg
  • Reconstruction of the Troitskiy Bridge across the Neva River in St. Petersburg
  • Construction of an interchange of the Ring Road around St. Petersburg with the Moscow Highway

Chief Engineer of the project

  • Reconstruction of the Blagoveshchensk Bridge across the Neva River in St. Petersburg
  • Design and construction of highways, bridges, interchanges and overpasses within the city of Ashgabat and Akhal Velayat
  • Reconstruction of the bridge crossing over the Staraya and Novaya Pregolya rivers of Kaliningrad
  • Western High-speed Diameter in St. Petersburg: section from the Ekaterinhofka River to Vasilyevsky Island, cable-stayed bridge over the Ship Fairway
  • Moscow Central Ring Highway: launch complex 5, section from M-3 "Ukraine" to M-10 "Russia"
  • Reconstruction of the M-1 highway "Belarus": section KM 45-KM66
  • The M-12 Vostok highway, stage 4 (km 224 – km 347) with a bridge crossing over the Oka River, is under construction.

We use cookies to improve the operation of the website and its interaction with users. By continuing to use the site, you allow the use of cookies and agree to the cookie policy. You can always disable cookies in your browser settings.

Accept