Dmitry Pikulev

Position:Chief Engineer of the project
Employer:CJSC "Institute of Projectstalconstruction"
Country:Russia

Background

For 30 years I have been involved in the design and reconstruction of dozens of industrial and civil buildings and structures.

In 1997— he became a calculation engineer at the Airship shopping Center in Moscow. Yekaterinburg;

In 2001, he was engaged in the calculation of the dome of the DIVS in Ekaterinburg;

In 2010, the design of the grinding and mixing complex of Mechel JSC in Chelyabinsk.

In 2015, he participated in the liquidation of the accident at Surgutskaya GRES-2.;

In 2017, the design of the airport in Perm;

In 2018, the design of the Uralskaya Steel CHPP building.

In 2020, the design of a half-timbered and suspended ceiling system at Gelendzhik airport.

In 2024, the design of the final structure with the spire of a high-rise building in Yekaterinburg.

I am currently engaged in the technical re-equipment of the building of the "Ausmelt" complex of JSC "Karabashmed" in Moscow. Karabash, Chelyabinsk region.

The asset includes a lot of work related to complex calculations of high-rise structures, sheet structures, recalculations of frames of existing buildings during reconstructions and technical upgrades.

From 2016 to 2023, he was an expert in the field of industrial safety.

Participated in several dozen industrial safety examinations of buildings and structures.

I take part in the design work on reconstruction and technical re-equipment at the leading enterprises of the region JSC RUSAL-Ural, PJSC EVRAZ NTMK, JSC TMK, JSC RMK, JSC SUMZ.

Since 2016, D.B. Pikulev has been a member of the Board of Directors of CJSC Institute Projectstalkonstruktsia.

We use cookies to improve the operation of the website and its interaction with users. By continuing to use the site, you allow the use of cookies and agree to the cookie policy. You can always disable cookies in your browser settings.

Accept