Pavilion No. 1
Implementation of unprecedented solutions for 37-meter columns for the "floating" buildings of the Badaevsky residential complex
Moderator:
Leading Design Engineer, Capital Group
Topics of presentations:
The unique architecture of the Badaevsky residential complex
Chief architect of the project, Capital Group
Implementation of unique solutions for 37m columns under "floating" buildings. Evaluation by the Customer
Leading Design Engineer, Capital Group
Design and calculation during the implementation of pipe–concrete structures - from design to installation
Head of the Department of Constructive Solutions, MARKS GROUP
Scientific and technical support for calculations and construction of super-slab columns and structures for floating buildings
Deputy Director for Scientific Work of the V.A. Kucherenko Central Research Research Institute of JSC SIC Stroitelstvo, Head of the Laboratory of High-rise Buildings and Structures, V.A.Kucherenko Central Research Institute, JSC SIC Stroitelstvo
Organization of control over the manufacture and installation of metal structures for columns and super-slabs. Why do we need "control control"?
Head of the Metal Structure Technology Sector at the VSIs Laboratory, V.A. Kucherenko Central Research Institute, JSC SIC Stroitelstvo
Manufacture and installation of 37m tube-concrete structures for columns of "floating" buildings
Director, ENG