Bridge crossing over the Moskva River near Novozavodskaya Street | JSC "Giprostroymost Institute — Saint Petersburg"

Construction within the framework of the development of transport infrastructure on the territory of the Mnevnikovskaya floodplain adjacent to the North-Western Chord with access roads necessary for their functioning, with the reconstruction of engineering networks and communications (stage 1).

The cable-stayed bridge crossing was designed taking into account the agreed architectural concept, the cable-stayed system includes a metal structure in the form of a sail.

Much attention is paid to the aerodynamic stability of the bridge.

Studies of the superstructure compartment and a full-scale model of the bridge in a landscape wind tunnel at the Krylov Center were carried out. The results of the study confirmed the aerodynamic stability of the stiffening beam and the sail. Fluctuations due to aerodynamic instability phenomena such as stall flutter, flexural-torsional flutter and galloping were not detected.

We use cookies to improve the operation of the website and its interaction with users. By continuing to use the site, you allow the use of cookies and agree to the cookie policy. You can always disable cookies in your browser settings.

Accept